Swimming Pool Demolition in Oppelo, AR

Find the right contractor to demolish and remove anything

America's #1 Source for Local Demolition Experts

18151, 30467, 32418, 17208, 24291
Compare Demolition Quotes
BTS Demolition Company logo

BTS Demolition Company

4.9
(17) -
Jacksonville, AR

BTS Demolition Company is a family-owned company with over 30 years of experience in the demolition industry. We are fully licensed and insured in the state of Arkansas and proudly provide our pool removal services in Jacksonville and the surrounding areas.... more

Greennecks logo

Greennecks

Oppelo, AR
  • Commercial
  • Residential
  • Transparent pricing

Greennecks is a versatile civil construction company that specializes in pool removal. We also take pride in recycling all material that is able to be recycled at local recycling facilities. Get an free project estimate by reaching out today! more

Junk King Dumpster Rentals logo

Junk King Dumpster Rentals

Bauxite, AR

Junk King Dumpster Rentals provides pool removal services throughout Little Rock, AR and the surrounding communities. We provide optimal service and competitive prices while utilizing the safest and most environmentally sound practices. more

MC

Mullen Construction

Mena, AR

Mullen Construction is a general contractor based out of Mena, Arizona specializing in construction, excavation, and demolition services. We have the manpower and equipment to remove pools, demolish houses, tear down barns and sheds, and much more. more

RD

Rayco Demolition

Conway, AR

For over 35 years, Rayco Mobile Home Demolition has been serving the Conway, AR area with our extensive demolition services, including pool removal, house demolition, and more. more

Pool Removal Tips for Oppelo, AR

Tips for Removing Pools

A pool fill-in—or partial pool removal—does not involve removing the entire pool, thus saving you time and money. Many homeowners choose this option as it is cheaper, faster, and does not take as long as a full removal. Pool fill-ins work as follows:

  • Drain the pool.
  • Punch holes into the bottom of the pool.
  • Demolish the top layer of the pool (18 in.-36 in.).
  • Place the rubble in the bottom of the pool.
  • Fill in the pool with additional dirt and topsoil.
  • Compact the soil.

Unless your city requires, a partial pool removal can be done without the oversight of an engineering technician. Be sure to confirm this with your contractor and/or local code enforcement entity.