Swimming Pool Demolition in Marcell, MN

Find the right contractor to demolish and remove anything

America's #1 Source for Local Demolition Experts

23896, 19053, 24556, 23496, 20920
Compare Demolition Quotes
demolition

Trout Enterprises

236 Po Box, Deer River MN 56636

Trout Enterprises approaches every project with the highest degree of professionalism. Since 1968, they’ve been serving homeowners, business owners, and more in the Deer River, MN area with demolition, excavating, grading, and similar services.

demolition

3 B's Company

20275 N Sugar Lake Trl, Cohasset MN 55721

3 B’s Company doesn’t cut corners when it comes to providing exceptional demolition services to residential and commercial customers in Grand Rapids, MN. They also perform excavating, landscaping, hauling, and septic installation services.

demolition

Mallum Hauling

27722 E Wyss Rd, Bovey MN 55709

Specializing in hauling services, Mallum Hauling provides practical, low-cost services for everyday homeowners, businesspeople, and industry leaders. For more than 25 years, they’ve been performing hauling, demolition, excavating, and septic tank services.

demolition

Gielen Construction Services

11901 88th Ave NE, Deer River MN 56636

For more than 10 years, David Gielen Construction Services has been providing Cass and Itasca Counties with Grade A demolition, excavating, landscaping, paving, remodeling, construction, and septic tanks and systems services.

demolition

Specialty Excavating & Asphalt

1520 NW 4th St, Grand Rapids MN 55744

Serving the greater Grand Rapids area and surrounding West Michigan communities, our team at Specialty Excavating & Asphalt specializes in providing residential and commercial demolition services, including mobile home demolition, pool removal, and more.

Pool Removal Tips for Marcell, MN

Tips for Removing Pools

A pool fill-in—or partial pool removal—does not involve removing the entire pool, thus saving you time and money. Many homeowners choose this option as it is cheaper, faster, and does not take as long as a full removal. Pool fill-ins work as follows:

  • Drain the pool.
  • Punch holes into the bottom of the pool.
  • Demolish the top layer of the pool (18 in.-36 in.).
  • Place the rubble in the bottom of the pool.
  • Fill in the pool with additional dirt and topsoil.
  • Compact the soil.

Unless your city requires, a partial pool removal can be done without the oversight of an engineering technician. Be sure to confirm this with your contractor and/or local code enforcement entity.