House Demolition in Mann, PA

Find the right contractor to demolish and remove anything

America's #1 Source for Local Demolition Experts

25656, 19598, 31697, 31875
Compare Demolition Quotes
HE

Hess Excavating Inc

Mc Connellsburg, PA

Hess Excavating Inc is an excavation and demolition specialist offering top-quality work throughout McConnellsburg, PA. We offer large-scale commercial demolition, backyard pool removals, house demolition, and more. more

PC

Palmer Construction Co Inc

5.0
(1) -
Mc Connellsburg, PA

Founded in 1978, Palmer Construction is a general contractor with a commitment to quality and customer satisfaction. Our team consists of the most dependable, courteous, and professional workers in the industry. Our spectrum of services includes all aspects of general contracting,... more

SE

Spangler Excavating

Bedford, PA

Serving Bedford and surrounding areas since 1996, Spangler Excavating does it all. Limited only by your imagination, our services include (but are not limited to): House demolition, concrete removal, dumpster rental, land clearing, and more. more

YC

You're Callin' We're Hallin'

Cumberland, MD

My wife and I started this business August 1st, 2018. We started it to help people get rid of that stuff you don’t, won’t, or can’t get rid of. We are not here to judge you on what... more

House and Garage Demolition Tips for Mann, PA

Project Tips for House & Garage Demolition

What steps should I take before demolishing my house?

If you're starting to think about demolishing your house, a crucial step in the process is disconnecting existing utility services. There are a variety of utilities and services that must be disconnected before demolition:

  • Electricity
  • Water
  • Sewage
  • Gas

BEWARE: Electricity and gas pose a particularly dangerous health risk if still active when demolition takes place. 

Surrounding supply sources can also be damaged if services have not been properly terminated. Neighboring homes can be at risk of losing services, and local power, gas, water, or drainage infrastructure can be affected, too.

Note: Most service termination requests need to be made in writing to the supply company two or more weeks prior to demolition. This will help ensure the company has enough time to terminate the service before demolition begins.