House Demolition in Hartford, KS

Find the right contractor to demolish and remove anything

America's #1 Source for Local Demolition Experts

31878, 25197, 20417, 30963
Compare Demolition Quotes
AA

All American Hauling

Osage City, KS

All American Hauling is a veteran owned and operated company that takes pride in what we do. The team at All American Hauling is reliable, reasonable, and always on time. All American Hauling now accepts cash, checks and all major... more

LE

Leiser Excavating, LLC

Hartford, KS

Leiser Excavating, LLC is an excavation contractor specializing in a wide variety of demolition jobs, including garage and house demolition.  more

SE

Schmidt Excavating LLC

Burlington, KS

For over 30 years, Schmidt Excavating LLC has been serving the Burlington, KS area with our wide variety of services, including garage and house demolition.  more

TD

TWS Dumpster Rental

Lebo, KS

At TWS Dumpster Rental, we understand how difficult it is to haul waste and get quality demolition services for a fair price, and we are here to assist you and make it easy. We specialize in house demolition and much... more

House and Garage Demolition Tips for Hartford, KS

Project Tips for House & Garage Demolition

What steps should I take before demolishing my house?

If you're starting to think about demolishing your house, a crucial step in the process is disconnecting existing utility services. There are a variety of utilities and services that must be disconnected before demolition:

  • Electricity
  • Water
  • Sewage
  • Gas

BEWARE: Electricity and gas pose a particularly dangerous health risk if still active when demolition takes place. 

Surrounding supply sources can also be damaged if services have not been properly terminated. Neighboring homes can be at risk of losing services, and local power, gas, water, or drainage infrastructure can be affected, too.

Note: Most service termination requests need to be made in writing to the supply company two or more weeks prior to demolition. This will help ensure the company has enough time to terminate the service before demolition begins.