Commercial Building Demolition in Harvey, AR

Find the right contractor to demolish and remove anything

America's #1 Source for Local Demolition Experts

17208, 15796
Compare Demolition Quotes
MC

Mullen Construction

Mena, AR

Mullen Construction is a general contractor based out of Mena, Arizona specializing in construction, excavation, and demolition services. We have the manpower and equipment to remove concrete, demolish commercial structures, tear down barns and sheds, and much more. more

RE

Raggio Excavating

Booneville, AR

Located in Booneville, AR, Raggio Excavating is a family owned demolition company specializing in both large and small projects. We can provide comprehensive services, ranging from house demolition to commercial demolition, and more. more

Commercial Demolition Tips for Harvey, AR

Tips for Removing a Commercial Building

How do I choose the right commercial demolition expert?

Commercial building demolition via explosion and/or implosion is the most efficient of all the various commercial demolition methods. But due to the various public health risks that go along with these explosions—like air quality concerns and airborne debris—this method is only suitable when demolition or deconstruction are not viable options. Due to the precision and skill required to accurately and safely execute an explosive/implosive demolition, it is imperative that you hire an experienced contractor. They will be able to accurately calculate and control the explosion to ensure the commercial structure comes down quickly and precisely.

How is commercial demolition done?

The most common method for commercial demolition is mechanical demolition—the kind performed with heavy machinery, like excavators, bulldozers, wire rope pulls, wrecking balls, etc. This equipment requires qualified professionals, and they can create quite a bit of noise and mess. Lots of dust, vibrations, airborne debris, and more are just some of the things that come with mechanical commercial demolition. The heavy machinery is used to tear down the structure as efficiently and safely as possible while minimizing public health risks.

Find out more: