House Demolition in Rutland, OH

Find the right contractor to demolish and remove anything

America's #1 Source for Local Demolition Experts

21056, 24252, 25652
Compare Demolition Quotes
Larry Lang Excavating logo

Larry Lang Excavating

Beverly, OH
  • Barns
  • Concrete & Asphalt
  • Mobile Homes
  • Since 1997
  • Top-tier equipment
  • Superior customer service

Larry Lang Excavating proudly serves the greater Beverly, OH area with exceptional demolition services. By utilizing top-tier equipment, we can successfully demolish and remove residential and commercial structures of all sizes. more

PE

Pullins Excavation Inc

Pomeroy, OH

Pullins Excavation Inc is based in Pomeroy, Ohio and serves surrounding areas. We are here to serve you in every capacity, providing excellent customer service and high-quality results that you deserve, including concrete removal, house demolition, and more. more

RE

Roses' Excavating & Trucking

Racine, OH

Roses’ Excavating & Trucking has built a reputation through tireless work ethic and honest customer service. We handle commercial and residential projects with equal proficiency and tact, including house demolition, pool removal, and more. more

House and Garage Demolition Tips for Rutland, OH

Project Tips for House & Garage Demolition

What steps should I take before demolishing my house?

If you're starting to think about demolishing your house, a crucial step in the process is disconnecting existing utility services. There are a variety of utilities and services that must be disconnected before demolition:

  • Electricity
  • Water
  • Sewage
  • Gas

BEWARE: Electricity and gas pose a particularly dangerous health risk if still active when demolition takes place. 

Surrounding supply sources can also be damaged if services have not been properly terminated. Neighboring homes can be at risk of losing services, and local power, gas, water, or drainage infrastructure can be affected, too.

Note: Most service termination requests need to be made in writing to the supply company two or more weeks prior to demolition. This will help ensure the company has enough time to terminate the service before demolition begins.