House Demolition in Tyro, KS

Find the right contractor to demolish and remove anything

America's #1 Source for Local Demolition Experts

28817, 32659, 16579, 15197
Compare Demolition Quotes
DC

Davis Construction

Coffeyville, KS

Davis Construction offers a wide range of services, including construction, demolition, snow removal, and more. Our team is committed to providing experienced, accurate, safely executed services. Contact us today for a free quote. more

EJ

Eldon's Junk Removal

Independence, KS

Don't let unwanted interior and exterior structures get in the way of your productivity at home or at work. Let Eldon's Junk removal remove old flooring, sheds, garages, interiors, above ground pools, decks, and more. more

GG

G & G Dozer

Caney, KS

G & G Dozer has more than 40 years of experience and is WBE and HUB licensed. There is no job that is too big or too small for our team of professionals to handle. We provide house demolition, concrete removal, and... more

RD

Rob Dent Excavating

Neodesha, KS

For over 30 years, Rob Dent Excavating has been providing the grater Neodesha, KS area with top-of-the-line demolition and excavation services. Let us exceed your expectations—contact us today to find out more! more

House and Garage Demolition Tips for Tyro, KS

Project Tips for House & Garage Demolition

What steps should I take before demolishing my house?

If you're starting to think about demolishing your house, a crucial step in the process is disconnecting existing utility services. There are a variety of utilities and services that must be disconnected before demolition:

  • Electricity
  • Water
  • Sewage
  • Gas

BEWARE: Electricity and gas pose a particularly dangerous health risk if still active when demolition takes place. 

Surrounding supply sources can also be damaged if services have not been properly terminated. Neighboring homes can be at risk of losing services, and local power, gas, water, or drainage infrastructure can be affected, too.

Note: Most service termination requests need to be made in writing to the supply company two or more weeks prior to demolition. This will help ensure the company has enough time to terminate the service before demolition begins.